Bomber Command, Lincoln

BomberCommand1
BomberCommand2
BomberCommand3
BomberCommand4
  • Construction
  • Formwork and Falsework

Contact us

Michael Clarke

Regional Sales Manager - Nottingham area

07836 265389

Challenge

A memorial for the thousands of crewmen who served in Bomber Command during World War Two has been officially unveiled in Lincoln. The Memorial Spire and Walls of Remembrance are the first significant development in the creation of the International Bomber Command Centre.  The Walls record the names of the 55, 573 men who lost their lives serving in Bomber Command. The Memorial Spire was designed by Stephen Palmer of Place Architecture and is now the UK’s tallest war memorial. It is 102ft (31.09m) tall – the wingspan of the Avro Lancaster and the width at the base is 16ft (5m), and the overall width of a Lancaster wing.

Back to top

Solution

Mabey supplied its Frami panel system to create the base of the memorial.  Regional sales manager Michael Clarke said: “The main challenge was the accurate placing and support of the bolt sets for fixing the Spire. Had these been incorrect, the Spire would not have been able to be attached to the base. By keeping in communication with the customer and using the skills of the engineering team to deliver the required scheme, we made sure their needs were met. “

The 31 metre high weathering steel spire, located on a hilltop overlooking Lincoln, is secured to the ground by a concrete base and can be seen for miles around. Lindum used a Frami system solution 8.25 metres square and 1.3 metres high to form the ‘mould’ in which to pour the concrete for the base. The Spire represents the first phase of the construction of the International Bomber Command Centre - a lasting legacy to the 1 million people who served or supported bomber command in world war two.

Mabey worked very closely with Lindum in order to meet all of the clients’ criteria. Together we ensured that the most cost-effective, practical and safe design was supplied.

Steve Clark, Contracts Manager from Lindum group said: "The accurate positioning of the holding down bolt assembly was crucial to this project which was the reason Lindum chose to use robust and stable equipment supplied by Mabey who also provided vital support for the temporary works design".

Back to top

The preparation of any Engineering Scheme should be undertaken by a suitably
qualified, experienced and competent individual. If you are in any doubt about
any of the information provided on this website, please seek advice from
Mabey Hire Ltd and our engineering team will be pleased to assist.
Whilst every effort has been taken to ensure that the contents of this website
are correct, Mabey Hire Ltd cannot be held liable for any inaccuracies.
Mabey Hire’s policy is one of continual improvement. Before using technical
information it is the responsibility of the user to check that information
is current and has not been superseded or amended.

I have read and understood the above

Downloads

Back to top