Mabey Universal Bridge

Mabey Universal

Mabey Universal - France

Mabey Universal

Mabey Universal, Changuinola - Panama

Mabey Universal

Mabey Universal - Papua New Guinea

Mabey Universal

Mabey Multi-Span Universal - Canada

Overview

Available to hire, the Mabey Universal™ is a robust modular bridging system designed to cope with the heavy duty vehicles used in construction, mining, oil and gas and extractive industries, and is available for both permanent and temporary applications.

The Mabey Universal™ system uses standardised, interchangeable steel components to provide robust, rapid-build solutions for permanent rural bridges, temporary access and emergency bridging. Achievable span lengths, in span increments of 2.25m, vary according to loading but multiple span structures supported on intermediate piers mean that the suitability of the Mabey Universal™ is not restricted by length of crossing.

The Universal Bridge's unique combination of pre-engineered modular components, simple pinned / bolted connections, heavy load capability and robust design makes the system ideal for use as a stock bridge system in country. Transport authorities worldwide use the Universal™ bridge as a rapid deployment bridge system, not only for disaster relief but also on public road diversions during bridge reconstruction or for heavy plant site access and temporary haul road applications.

For more information on how our Universal Bridges can suit your application, or if you need more advice, please contact our Expert.

Benefits

  • Modular
  • Rapid-build
  • Can be assembled using light plant
  • Can be crane built or cantilever launched
  • Relocatable
  • Transport in standard containers
  • Single and multi-span solutions available
  • Long span capability
  • Robust
  • High fatigue capability
  • Heavy axle / Wheel load capacity
  • Long life with minimal maintenance
  • Optional ramps, footwalks, piers, parapets and barriers
  • Various deck options available
Back to top

Standard Specification

Module lengthCarriageway widthsNumber of lanesInternal pedestrian walkwaysCantilever pedestrian walkwaysFinish

4.5m

(Half module = 2.25m)

3.15m to 10.5m1, 2 or 30.5m or 1.0mUp to 1.5mHot-dip Galvanised:
BS EN ISO 14713 & 1461 ASTM A123
Back to top

The preparation of any Engineering Scheme should be undertaken by a suitably
qualified, experienced and competent individual. If you are in any doubt about
any of the information provided on this website, please seek advice from
Mabey Hire Ltd and our engineering team will be pleased to assist.
Whilst every effort has been taken to ensure that the contents of this website
are correct, Mabey Hire Ltd cannot be held liable for any inaccuracies.
Mabey Hire’s policy is one of continual improvement. Before using technical
information it is the responsibility of the user to check that information
is current and has not been superseded or amended.

I have read and understood the above

Downloads

Back to top