Our Customers

10093

We work across a range of sectors, solving construction and maintenance challenges through engineering excellence for customers around UK, Australia and New Zealand.

We pride ourselves on working in partnership with our customers, delivering on projects in sectors including construction and infrastructure, highways and utilities.

We serve a diverse and broad customer base, ranging from government departments, through major contractors to small local businesses. No challenge is too big or too small - our commitment to service ensures that we deliver to all our customers.

For examples of projects across the sectors we work in, take a look at our project case studies below.

Back to top

What our customers say

By achieving verification certification, Mabey has demonstrated its commitment to being compliant with the requirements for PAS 1192-2 covering Design and Construction for BIM Level 2, as detailed in the Construction Prequalification Questionnaire document - PAS 91.  The team should be very proud of this achievement and will now be benefiting from improved collaboration right across the supply chain.

Andy Butterfield, Director of Built Environment, Product Certification at BSI

 

A heavy duty access solution to the project, in an area of high environmental value was required urgently. Mabey’s response was excellent, rising to the challenge – they worked with us as a team through difficult Scottish weather, and we managed to successfully complete the project ahead of schedule.

Ian Steele, Project Manager at Siemens BAM

Back to top

We have been impressed with the capabilities and attention to detail the team from Mabey have shown the throughout the project. Collaboration is key on major works such as this and it is good to have supply chain partners that we can trust and rely on.

Brian Stephenson, GRAHAM construction site manager.

Mabey Hire provided an absolutely first-class response. From the initial call, Mabey Hire engineers designed and delivered a solution that enabled us to re-open the road in little over 24 hours. The team worked tirelessly, and we are extremely grateful for their support.

Graham Porter, General Manager Area 13 M&R at Kier Highways

Back to top