SUPPLYING ENGINEERED SOLUTIONS FOR TEMPORARY WORKS
800.956.2239 | REQUEST A QUOTE   search
 

Excavation Support Large Excavations Shoring Propping JC Strut Mabey Bridge & Shore

JC Strut 

Excavation Support Large Excavations Shoring Propping Mechanical Bracing Strut Mabey Bridge & Shore

Mechanical Bracing Strut

Excavation Support Large Excavations Shoring Propping Hydraulic Bracing Strut Mabey Bridge & Shore

Hydraulic Bracing Strut

Excavation Support Large Excavations Shoring Propping Super Strut Mabey Bridge & Shore

Super Strut

 

BRacing struts

Bracing Struts

Mabey bracing struts are required when the load imposed by the ground exceeds the load capacity of the waler. This can occur during very large excavations or anytime that high loads are imposed. As always, Mabey's engineering staff is available for advice and calculations as necessary.

JC Strut

  • Size range: 1.64' - 20'
  • Capable of supporting 100 kips
  • Manually operated screw jack system
  • Designed for use with the Mabey PowerBrace system

Mechanical Bracing Strut

  • Size range: 7.48' - 26.21'
  • Capable of supporting 90 kips
  • Manually operated
  • Designed for use with the Mabey PowerBrace system

Hydraulic Bracing Strut

  • Size range: 5.4' - 30'
  • Capable of supporting 81 kips
  • Hydraulically powered
  • Designed for use with the Mabey PowerBrace system

Super Strut

  • Size range: 13.3' - 64.4'
  • Capable of supporting 281 kips
  • Hydraulically assisted removal
  • Designed for use with the Mabey PowerBrace system